Terms & Conditions
FOOGLE ROOFING & REFURB TERMS AND CONDITIONS
- This is subject to materials and labour being available when required.
- Samples, if submitted for approval, to be accepted as showing substance and general character only. Equality of bulk in colour, size or shape cannot be guaranteed,
- All materials delivered to the site by us, or to our order, are to remain our property until fixed by our staff on our instructions or until paid for.
- No responsibility will be taken for any delay, loss or damages caused by strikes, labour disputes, or inclement weather, changes of design or specification or any other circumstances beyond our control.
- Care will be taken when working on roofs above existing ceilings, but no responsibility will be taken where damage is caused to ceilings during the progress of the work, unless cause by our negligence.
- The company shall not be responsible for damage to ceilings, walls, gutters or building fabric, if such items are found to be defective before or during commencement of work or where damage is caused by unavoidable vibration.
- For contract work on new buildings, lime, cement and scaffolding are not included in this quotation.
- This does not include work of other crafts or trades or making good after it unless specifically mentioned overleaf or unless an item for the same is included in the Bills of Quantities where provided.
- Payment shall become due forthwith upon the submission of our account. Where the period of the work exceeds one month, arrangements shall be made for interim stage payments. Payments not forthcoming within the month period will attract an interest payment at current bank base rate level.
- This does not include any work to timbers and substrate materials found necessary once roofs opened up unless mentioned in our quotation.
- This quotation is open for acceptance for a period of one month from the date hereof, after which it will be subjected to confirmation or adjustment.
- No responsibility for ponding of water on flat roofs will be taken following re-roofing works.
- SPECIAL CONDITION WHERE CUSTOMER IS A TRADE CUSTOMER OR CONTRACTOR.
Where a Contract is based on priced Bills of Quantities and measurements, the Royal Institute of Chartered Surveyors shall in accordance with the current Standard method adopt these, unless specified to the contrary in the Bills of Quantities. Upon completion the works will be re-measured in accordance with the Standard Method of Measurement and any price adjustments made accordingly. - Unless otherwise agreed in writing between the Company and the Customer any materials stripped by the Company in re-roofing contracts shall become the Company’s property.
- The Employer shall supply a safe connection to suitable electricity mains supply and provide water when required.
- This quotation is based on works being executed during normal working hours.
- No one else is to touch or work on the roof without our permission. This will result in our guarantee being made void.
WHAT OUR CUSTOMERS SAY ABOUT US
I recently entrusted Foogle Roofing & Refurbishment with my roofing needs, and I am thrilled with the exceptional results. Their team of experts provided an array of tailored solutions that perfectly matched the requirements of my home and budget.
The roofing solution they delivered not only met my expectations but surpassed them by ensuring long-lasting durability and stunning aesthetics.
I cannot speak highly enough of Foogle Roofing & Refurbishment. From the moment they arrived, they exuded professionalism and delivered exceptional service. Their team not only completed the work promptly, but also went above and beyond to ensure every detail was perfect. They truly are experts in roofing repairs and I have already recommended them to others with confidence!